KJ intrade Co.,Ltd.
|
Price: | 0.7 USD |
Payment Terms: | T/T,L/C,WU,Paypal |
Place of Origin: | Zhejiang, China (Mainland) |
Add to My Favorites | |
HiSupplier Escrow |
2015 newest solution for GU10 bulb
Product name | LED GU10 spot bulb | ||
Item No. | LED-MRG-S10P03 | LED-MRG-S10P03 | LED-MRG-S12P03 |
Voltage | 220-240V | 220-240V | 220-240V |
Power | 3W | 5W | 7W |
Lumen | 270-300lm | 380-420lm | 500-550lm |
Meterial | PC aluminium body + PC milkly cover | ||
Colour | WW(2700-3200K) CW(6000-6500K) | ||
Beam angle | 150° | ||
Dimmerable | NO | ||
Ra, PF | Ra:80 PF:0.5 | ||
SDCM | <6 | ||
Certificate | CE RoHS ERP | ||
Size | D50*H54mm | ||
Warranty | 2years |
2015 newest solution for MR16 bulb
Product name | LED MR16 spot bulb | ||
Item No. | LED-MR16-S10P03 | LED-MR16-S10P03 | LED-MR16-S12P03 |
Voltage | 12V | 12V | 12V |
Power | 3W | 5W | 7W |
Lumen | 270-300lm | 380-420lm | 500-550lm |
Meterial | PC aluminium body + PC milkly cover | ||
Colour | WW(2700-3200K) CW(6000-6500K) | ||
Beam angle | 150° | ||
Dimmerable | NO | ||
Ra, PF | Ra:80 PF:0.5 | ||
SDCM | <6 | ||
Certificate | CE RoHS ERP | ||
Size | D50*H48mm | ||
Warranty | 2years |
Delivery time:
- 7days for sample, 30days for bulk order
Payment term:
- 30% deposite, 70% before shipment
Our service:
- your will inquiry reply within 24hours
Packing:
- colour box or blister both available
Application:
- Directly replace halogen bulbs. in hotel, conference room, show case, exhibition, supermarket and so on, easy to install and maintain.
Refine lab, any time to check quality before, in, after producing.
1, LED light sources test after mass producing, each bulb will light at least 3months(24hours lighting per day)
2, LED light sources before or during producing. on/off test
3,LED light fixture part.
4, Test Mechine 1
5, Test Mechine 2 (include LED chip mechine)
6, High temperature test mechine
7, Producing online, for mass producing
8, aging test Mechine during mass producing, each bulb will light at least 4hours